Monday, 17.03.1997
|
| Time
|
Event
|
Lecturer / Comment
|
| 09.00 - 10.30 |
Welcome and Introduction Lecture
 | Workshop Information |
 | What is a Space Station |
 | System and subsystem point of view |
 | space utilization, space qualities and utilisation disciplines |
 | typical payloads and user facilities |
|
Messerschmid |
| 11.00 - 12.00 |
Lecture: History and current projects |
Messerschmid |
| 13.30 - 14.00 |
Mission Statement |
Messerschmid, Bertrand |
| 14.00 - 15.30 |
Lecture: Systems Engineering (1)
 | The Systems Engineering Process:
overview, methodology, tools |
 | Mission Analysis |
|
Bertrand |
| 16.00 - 17.30 |
Workshop 1:
 | identify broad objectives |
 | identify constraints and requirements |
 | establish system scenario |
|
Bertrand, Hinüber, Krüger |
Tuesday, 18.03.1997
|
| Time
|
Event
|
Lecturer / Comment
|
| 09.00 - 10.00 |
Preliminary Requirements Review (PRR)
 | review of constraints and requirements |
 | review and negotiation of system scenarios |
|
Messerschmid, Bertrand |
| 10.00 - 11.30 |
Lecture: Space Station Power Systems
 | power levels and power needs |
 | energy sources and converters |
 | PV and SD systems |
 | space station EPS sizing |
|
Messerschmid |
| 12.00 - 13.30 |
Lecture: Environmental Control and Life Support
 | physiological and metabol. requirements |
 | air and water management |
 | regenerative functions and syngergisms |
 | MELISSA |
 | design relevant parameters |
|
Bertrand, Osburg |
| 15.30 - 17.00 |
Mercedes Benz Museum |
|
| 19.00 - ? |
"Schwäbisch" Dinner in downtown Stuttgart |
|
Wednesday, 19.03.1997
|
| Time
|
Event
|
Lecturer / Comment
|
| 09.00 - 10.30 |
Lecture: Attitude and Orbit Control for Space Stations
 | driving environmental influences |
 | flight modes an strategies |
 | actuators |
 | AOCS design and sizing |
|
Hinüber |
| 11.00 - 12.30 |
Lecture: Systems Engineering (2)
 | characterizing the system |
 | design examples: CDG-concepts |
 | ISS design analysis |
|
Bertrand |
| 13.30 - 17.00 |
Workshop 2
 | space station topology |
 | power system |
 | AOCS |
 | system budgets |
|
Bertrand, Hinüber, Krüger, Osburg |
| in the afternoon |
MELISSA Tutorial
 | 30 min. to get acquainted with the MELISSA tool |
|
Osburg
participants: one or two persons of each design team |
| 19.00 |
Visit of Stuttgart Planetarium
 | public performance |
 | special guided tour afterwards |
|
|
Thursday, 20.03.1997
|
| Time
|
Event
|
Lecturer / Comment
|
| 09.00 - 12.00 |
Workshop 3
 | System characterization and evaluation ctd. |
|
Bertrand, Hinüber, Krüger |
| 13.30 - ??? |
Workshop 4
 | System characterization and evaluation ctd. |
 | preparation of final presentation |
|
Bertrand, Hinüber, Krüger |
| along the day |
on-site visit of the IRS
 | Plasma Wind Tunnels |
 | Electric Propulsion Lab. |
|
|
Friday, 21.03.1997
|
| Time
|
Event
|
Lecturer / Comment
|
| 09.00 - 12.00 |
Final Presentation
 | presentation and review of the design concepts |
|
Messerschmid, Bertrand, Hinüber, Krüger |
| 13.30 - 15.00 |
Conclusion
 | Graduation |
 | Feedback and Discussion |
|
Messerschmid, Bertrand, Hinüber, Krüger |